How-To

Step-By-Step Guide To Trex Transcend® Horizontal Railing Installation

November 14, 2019
SHARE

Trex Transcend® railing is our highest-performing composite railing option, giving you a first-in-class design and seemingly endless options - as well as a 25-year performance warranty. With more colours and component profiles than any other railing, Trex Transcend railing provides quality, durability, and requires very little upkeep.

Follow this simple 11-step guide to learn how to install your Trex Transcend horizontal railing and posts.

Step 1: Install Pressure-Treated Posts

When installing posts, review the actual lengths of the railing and set posts accordingly. They should be installed 6’ or 8’ on centre to accommodate for appropriate railing length.

Once the appropriate length is confirmed, you’ll use ½ inch carriage bolts to attach the posts. Keep in mind that the minimum joist size is 2 x 8 inches and the top bolts must be 1 inch from the top of the joists with bottom bolts 5-1/8 inches from the top bolts.

You can also countersink the bolts to be flush with your framing to allow for fascia attachment.

Note: Blocking can be added for extra strength, please verify with your local building code official.

The attachment of the posts to the substructure is one of the most critical parts of a railing system. Ensure all local building codes are understood and followed.

Step 2: Install Post Sleeve Skirts and Post Sleeves

For installing deck railing posts, begin by sliding the post sleeve skirt over the post, all the way down so it rests on the deck surface. Then, slide the post sleeve over the post and position it inside the post sleeve skirt.

Note: Shims can be used to plumb post sleeves.

Step 3: Install Railing Support Brackets (with TrexExpress™ Railing Template)

Start by placing your railing support brackets (RSB) in the TrexExpress™ template (included as a part of the post sleeve box). It’s important to place the top RSBs flat-side up and bottom RSBs flat side down. Secure the template on the post with either tape or a rubber band to ensure that the bottom of the template rests on the recently added post skirt.

Once fitted, secure the RSBs with the 2 inches timber screws that are provided in the railing kit and remove the template. Repeat this step for the other posts.

Step 4: Cutting Railings and Baluster Spacers

Ensure posts are plumb. Snap baluster spacers into rails, and place rails between posts ensuring baluster holes are equally spaced from each post. Cut rails and baluster spacers to the same length. Once cut remove the baluster spacers from the rails.

Tip: If using optional gaskets, subtract 1/16” from each end of the rail before cutting.

Step 5: Prepare Footblock Hole for Bottom Rail

Attaching the footblocks requires you to invert the bottom rail, centre and drill a hole using a 3/16 inch drill bit. This will serve as the location for the footblock attachment, which will be installed last.

Note: One footblock is required for all railing spans.

Step 6: Attach Bottom Rail (Universal Rail)

For this step, lift the bottom rail so the RSBs are in the channel and then attach them with the provided three self-tapping screws using the three outer holes. It’s important you DO NOT use the hole in RSB that is closest to the post.

Note: If a two-hole bracket is included, attach rail with the provided two self-tapping screws.

Tip: Place included gaskets between the rail and post sleeve prior to attaching the rail to the RSB.

Step 7: Attach Top Rail – Crown Rail

When you’re ready to attach the top rail, start by placing the crown rail on the RSBs. Then attach the top rail to the RSB with three self-tapping screws (provided). Like the bottom rail attachment, use the three outer holes -- and NOT the hole in the RSB that is closest to the post.

Note: If two-hole bracket is included, attach rail with the provided two self-tapping screws.

Tip: Place included gaskets between the rail and post sleeve prior to attaching the rail to the RSB.

Step 8: Placement of Baluster Spacers

With the bottom rail attached, snap in lower baluster spacer. Simply place the top spacer on the bottom spacer but invert it (it will slide up the balusters in a subsequent step).

Step 9. Attaching Balusters

Place baluster into both baluster spacers, ensuring that balusters are fully seated into the channel. Working at a slight angle, manoeuvre balusters into top rail.

Step 10: Secure Balusters

Slide the inverted top baluster spacer up and snap onto the top rail.

Tip: Spray the balusters with soapy water to aid in sliding the baluster spacer for the top rail into place.

Step 11: Attach Post Caps and Install Footblocks

You’re almost finished. The final step is to secure your post caps with silicon or PVC adhesive. When attaching the footblock, make sure to follow the footblock instructions.

Tip: Hold the post caps in place with blue painter's tape to ensure they do not blow off due to strong winds before the silicon or adhesive dries.

Note: Clean up any excess adhesive before it dries.

Need a visual? Check out our How to Install Trex Railing video.

For a more detailed set of installation tools, materials and instructions, download our full Trex Railing Installation Guide.

Unable to Add to Cart

You may order up to 4 free samples. To adjust your selections, remove what you do not need and then add your new choices.